Auraria Higher Education Center People Mover, Denver: Completed system planning, preliminary design, route selection, alignment layout, capacity analysis, station and maintenance facility location selection, alternatives analysis for guideway alignments and vehicle, and project capital construction cost estimate for all subsystems including train control, stations, track/guideway, substations, power rail, system-wide electrical, communications, automated fare collection, and O&amp;M facilities. This monorail system is to connect parking facilities at Mile High Stadium with the college campus. Completed a site inspection, performed an alternatives analysis, and completed the preliminary guideway structural analysis for the I-25 freeway crossing. 