Coöperatie Zuidenwind has poured the concrete for the foundation in Heibloem in the Netherlands and created the basis for the installation of their wind turbines. The foundation design and calculation for this project was done by CTE Wind Civil Engineering. The expert in foundation design WTG suggested their Soft-Spot® instead of a typical pile foundation.