An HS2 Rebellion tree protector climbs a mature tree at Denham Protection Camp on 7 September 2020 in Denham, United Kingdom. Anti-HS2 activists continue to try to prevent or hinder works on the controversial £106bn high-speed rail link for which the start of the construction phase was announced on 4th September from a series of protection camps based along the route of the line between London and Birmingham.